Supply And Installation Of Closed Circuit Monitoring System
Purchaser (Jia Fang):
Supplier (Party B):
In accordance with the contract law of the People's Republic of China and the relevant provisions of the state, the contract is concluded through full consultation with both parties in combination with the specific circumstances of the project.
I. project:
1, project name: closed-circuit monitoring system supply and installation works.
2. Delivery and installation sites:
The mode of contracting and the scope of contract: this project is contracted by Party B in the form of contract making, packing, package quality, contract period, risk of package, design of the package (whichever is approved by Party A). Party B must contract the whole system's equipment supply and installation and commissioning according to the design plan, system functions and equipment and materials of Party A.
(the design is subject to Party A's approval).
Two, the total cost and payment of the system:
(1) total system cost
1. The total cost of the monitoring system, including the cost of inductive card, is RMB.
2, the whole system must satisfy the functional requirements of the design plan approved by Party A, and the design and construction plan approved by Party A shall be the standard. On this basis, the price will no longer be adjusted.
(two) payment for project payment
Party A pays Party B's works according to Party B's progress.
1, the date of signing the contract, Party A pays the total amount of the project.
2. The project is completed, and the test is successful.
3, through the first party inspection and acceptance of the relevant departments, and the system runs without fault for one month, then pay the total project amount%.
Three. Duration:
1. After the signing of this contract, Party B will enter the field on the day of the month and end until the end of the month.
Complete installation and commissioning (subject to acceptance by users and Party A representatives).
2, during the performance process, due to the change of design period or Party A's liability and force majeure, the time limit for the construction period will be postponed, and the time limit for the construction will be adjusted after the approval of both parties, so as to determine the completion date.
Four, supply and installation:
1, the project must be strictly in accordance with the state's construction and installation specifications for construction.
2. The materials and equipment used by Party B must conform to the design plan approved by Party A. otherwise, Party A shall have the right to require Party B to replace it, and the cost shall be borne by Party B.
3, the auxiliary materials used by Party B must be provided with the template first and written approval by Party A.
Five, maintenance and repair:
1. The warranty period of this monitoring system is one year from the date of completion of the project and from the date of acceptance by Party A and the relevant departments.
During the warranty period, if the system finds fault, Party B must send the staff to repair within eight hours from the date of receipt of Party A's notice.
2, after the expiration of the warranty period, Party A requests Party B to repair, with the price in the Schedule 1 of this contract appropriately to Party A.
3, after the expiration of the warranty period, Party A and B shall sign another technical maintenance agreement, and Party B shall provide concessionary paid technical maintenance to the system.
4, Party A requires that the improvement of hardware and software functions and expansion is not guaranteed, but Party B shall continue to provide the most preferential services to customers.
The cost of maintenance or repair is only charged during the maintenance period.
The following circumstances are not within the scope of warranty: damage is caused by self dismantling and changing any part of the machine, such as lines and parts, and failure caused by the installation of professional equipment by Party B's designated professional and technical personnel.
Six, the responsibilities of both parties:
(1) Party A's responsibility:
1, check the design plan and installation plan of Party B, and complete the project within days after receipt.
Provide necessary premises and construction electricity to Party B.
2, pay the project payment to Party B according to the progress of the project.
3, appoint the site management representative to supervise and inspect the quality and progress of the project.
Handle and coordinate matters related to the construction of both parties.
4, after Party B supplies, Party A can organize personnel to check the equipment.
5, the organization for the completion of the project acceptance and completion settlement.
(two) Party B's responsibilities:
1. According to the safety regulations for construction, do well the construction quality and safety management. All the construction quality and safety accidents occurred during the construction period are responsible for and report to Party A and the relevant departments.
2, the suspension, rework, material and equipment losses caused by the responsibility of Party B shall be borne by Party B.
All equipment and equipment shall be properly protected by Party B before acceptance. If any damage or loss occurs, Party B shall be responsible.
3, responsible for the construction quality problems found during the warranty period after completion and acceptance.
4. It is responsible for the protection of all completed buildings and building fitment, equipment and appliances. If the property of Party A or household is damaged during construction, Party B shall be responsible for compensation.
5, comply with Party A's regulations on site management and handle the relevant formalities.
Seven, liability for breach of contract:
1, in addition to force majeure (war, natural disasters, etc.), Party A and B should strictly abide by the terms and conditions of this contract.
otherwise
The default party shall pay the other party a penalty of% of the total cost of the contract, and the liquidated damages shall not be enough to make up for the loss of the other party, and the breaching party shall also be liable for the deficiency.
2. If Party A fails to pay according to the progress of this contract, the penalty shall be paid on the basis of the amount of the unpaid amount per day for each delay.
3, due to Party B's reasons, it can not be pressed.
Construction period
For completion of the project, the penalty shall be paid to Party A according to the total cost of the project every one day after the overdue date.
Party A has the right to terminate the contract unilaterally beyond the date of expiry of the contract. In addition to paying the above sum and returning all payments already made by Party A, Party B shall pay liquidated damages to Party A in accordance with the% of the total price of the contract, and the liquidated damages shall not cover the loss of Party A. Party B shall also be liable for the deficiency.
4. If the monitoring system affects the acceptance of the project due to the quality problems of the system, Party B must replace and repair it until it reaches the acceptance standard.
Eight, other matters:
1, the liquidated damages, damages and various economic losses that should be paid in accordance with the provisions of this contract shall be
To make clear
The responsibility will be paid within the day after tomorrow, otherwise it will be processed according to late payment.
2. If there are any unsettled matters in this contract, we shall sign a supplementary agreement after friendly negotiation between the two parties.
3, there is a dispute between the two parties in the execution of this contract. The two parties should negotiate first. If the negotiation fails, either party may bring a suit in the people's court.
4, the two sides sign the approved design and construction plan and other written materials confirmed by the two sides are all part of this contract, which is equally valid with this contract.
5. All changes or requirements outside the construction and design plan of the Party A and Party B must be written to the other party. The other party must return the letter in time after receiving the notice, if the reply is not accepted in the day.
6. The contract and its annex shall come into force on the date of signing and sealing by both parties. After the expiration of the warranty period, the eighth and second sections of the contract still need to be performed.
7. There are two copies of this contract. Each party holds one copy and has the same legal effect.
Party A: Party B:
Contract representative: contract representative:
Contact number: contact number:
Address: Address:
签约地点: 签约时间: 年 月 日
- Related reading
- Show show | Hunan Fashion Fair, Su Bai Is The Champion.
- News Republic | In Order To Ensure The Quality Of Ready To Wear Clothes, The Children Of The Time Box Are Escorted By Many Links.
- Footwear industry dynamics | New York Brand Steve Madden Launches Brand New Shoes, Naked Copy?
- Fashion shoes | Nike Air Tailwind 79 Shoes Orange Orange New Color Comes Out, Retro OG Fan
- Bullshit | Herschel Supply 2019 New Winter Luggage Series On Sale
- Market trend | Crude Oil Explosion In Iran Oil Tanker Is Expected To Skyrocket. Chemical Fiber Raw Materials Will Probably Increase.
- Fashion shoes | Grey Nike Air Force 1 Must Not Be Missed!
- Popular color | Popular Color Release: Autumn Forest Group Green, You Win A Lot!
- Daily headlines | Quality Bulletin: 40 Batches Of Samples Of Textile And Garment Products In Hainan Province Are Unqualified, 1 Batches.
- Market trend | ICE Cotton Slipped, Investors Are More Concerned About The Progress Of Sino US Trade Negotiations
- Health Tips: Pay Attention To Scientific Wear And Good Health
- Large And Medium Repair Contract For Equipment
- Shoe Company XTEP Holds Annual Commendation Conference And New Year Party
- Chinese And Foreign Contract For Assembling Parts Supplied By Customers
- System Engineering Contract
- Contract For Feasibility Study Of Construction Projects
- Turkmenistan Adjusted Its Output Of Raw Cotton.
- Integrated Kitchen Production Contract
- India Released Its Anti-Dumping Investigation Report On Glass Fiber To China
- Repair And Repair Contract